This project was carried out during the 2024 summer shutdown in conjunction with other SEC/Client shutdown projects at this uranium mill. The work involved the replacement and upgrade of the existing Calciner BurnerManagement System at the McClean Lake Mill to fully comply with current B149.3 code requirements and to ensure consistent operation and reliability of the Calciner BMS system.