This work executed during mill operations, with tie-in points for active piping systems completed during the 2024 shutdown to minimize disruption to mill operations. The scope includes new housekeeping concrete pads, piping fabrication/installation, and emergency pull stations at the Mine Liquid Propane Storage/Vaporizer Areas.