SEC contracted under Core Industrial Services to perform mechanical, piping and electrical services on the new shaft loading pocket. Work included was setting diverter gates and flasks, shaft cross piping with dryers & reciver equipment, washdown water piping and air pocket piping. Our E&I team procured and installed cables & trays required to power equipment, shaft signalling system, hoist remote instrumentation, fibre cables, lighting, receptacles and grounding / bonding.

Additional Photos

crossmenu