In 2021, SEC was awarded the Surface Ore Bunker Upgrade project in Snow Lake, Manitoba. The scope included the turnkey design, supply, fabrication, and installation of an engineered head cover and two steel doors, along with all related concrete and civil work. Upon completion, SEC commissioned the hydraulic system and completed a full turnover to the client for operational use.