In 2023, SEC was awarded a load out floor replacement project which required completion within 60 days. While keeping safety as a core value for the project, SEC was able to complete all demolition work, blast and paint the existing structural steel, install all new structural steel, grating & checker plate, and spray foam the underside of the floor before turning the project back over to the client within the required window of time.

Additional Photos

crossmenu